0 of 6 Questions completed
Questions:
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
0 of 6 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Your score was below 70% correct. Please retake the quiz.
Your score was above 70% correct. Congratulations on completing the training!
Dumpsters and trash cans should remain closed at all times unless waste is actively being placed in the dumpster.
It is the responsibility of LAC to train all Tenant employees.
The operators of each facility are co permittees under LAC’s permit and have the responsibility to ensure their facility is in compliance which includes taking corrective actions as needed.
Tenant and operators do NOT need to routinely provide information to LAC to maintain compliance with the SWPPP.
There is NO issue with driving a piece of equipment around if it only has a small leak and absorbents do not need to be placed under the equipment when its parked.
Interior floor drains in hangars or bays discharge to the storm drainage system and are for emergency use only. Nothing such as mop water, floor rinse water or leaks from equipment should enter these drains.