Welcome to the Lafayette Airport Commission’s Construction Stormwater Training. You are required to
complete this training as per the Louisiana Department of Environmental Qualities General Permit for
Discharges from Small Municipal Separate Storm Sewer Systems (MS4).
In this course you will learn:
Part 1
• Training Goals and Objectives
• Construction Stormwater Permitting Overview
• LAC MS4 Requirements and Stormwater Management Plan
• LDEQ Construction Stormwater Permits
Part 2
• Spill Prevention, Control, and Countermeasures Plan Requirements Review
• Discharge Countermeasures
• Spill Reporting and Response
Part 3
• How to get a Permit
• Project Specific SWPPP
• Construction SWPPP Implementation
• Control Measures (BMP) Installation
• Site Stabilization
Part 4
• Inspection Procedures
• Inspection Issues
• Inspection Reports
• BMP Maintenance and Upkeep
• Corrective Action Log Review
• Final Stabilization and Ending Permit Coverage
Part 5
• Compliance and Enforcement
• LAC Compliance and Enforcement Regulation
• Return to Compliance
• LDEQ Violations and Fines
Please watch the videos in their entirety and take the quizzes. Upon successfully completing the course
you will receive a link to download a certificate of completion.